Project Overview
The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.
Challenges, Objectives and Results
The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.
More Case Studies
Design, Fit-out, Partitioning
Design Group
We successfully completed a 3-phase refurbishment of the Design Group HQ. The project involved updating key office areas with new lighting, flooring, partitions, furniture, and full redecoration. Despite tight deadlines, Project XV delivered high-quality results, with the client praising their adaptability and communication throughout the process.