Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

Regent Holidays

Fit-out

Regent Holidays

New office fit-out, extending the boardroom, updating the kitchen, and installing new IT infrastructure

Arrow link.
West Point Row

Flooring, Suspended ceilings

West Point Row

Project-XV refurbished West Point Row's unit 4 in 4 weeks, including strip out, new ceilings, flooring and kitchen.

Arrow link.