Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

3 Newbridge Square

CAT-A

3 Newbridge Square

3 Newbridge Square underwent a large refurbishment program including replacement of HVAC.

Arrow link.
Beacon Tower - Kinisi Industries

Fit-out

Beacon Tower - Kinisi Industries

Project XV were instructed by AEW to fitout the 13th floor of beacon Tower for incoming tenant Kinisi Industries.

Arrow link.