Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

OVO Energy

Design, Fit-out

OVO Energy

Comprehensive office refurbishment incorporating new flooring, plumbing, decoration, tiling, cubicle installation, and the supply of lockers and benches.​

Arrow link.
Penguin

Design, Fit-out

Penguin

Expanded office space; ground floor for meetings and seminars, second floor for open plan team with breakout areas.

Arrow link.