Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

West Point Row

Flooring, Suspended ceilings

West Point Row

Project-XV refurbished West Point Row's unit 4 in 4 weeks, including strip out, new ceilings, flooring and kitchen.

Arrow link.
Enterprise Rent-A-Car

Design, Fit-out

Enterprise Rent-A-Car

Enterprise Rent-A-Car renovated branches to improve service, HQ used bright colours for standout space.

Arrow link.