Project Overview

Project-XV was appointed to manage the dilapidation and reconfiguration of three subdivided suites, working closely with both the landlord and incoming tenant, the goal was to open up the space and deliver a cohesive, high-performing workspace tailored to Egis' operational needs.

No items found.
Scope of Work

The space was transformed through a full reconfiguration and fit-out, including the installation of new glazed and solid partitioning, fresh flooring throughout, and suspended ceilings integrating lighting, power, and data. Efficient new air conditioning systems were installed to support comfort and performance. Folding partition walls were introduced for flexibility, complemented by feature walls, modern finishes, and fresh decoration to add character to the space. A seamless relocation of furniture and equipment ensured continuity for the client throughout the transition.

No items found.
Impact and Future Potential

From concept through to completion, the project was delivered to a high standard, on time, and in line with Egis’ requirements. The result is a modern and adaptable workplace designed to support collaboration, productivity, and future growth.

No items found.

More Case Studies

Beacon Tower 8th floor and communal areas

Flooring, spot lighting, Cat-a fit-out

Beacon Tower 8th floor and communal areas

Beacon Tower's 8th floor was stripped back with a comprehensive refurbishment while also redesigning WC's, lift lobbies, and implementing a modern CAT-A fit-out.

Arrow link.
Ty Gwent, Cwmbran

Design, Fit-out

Ty Gwent, Cwmbran

To attract tenants to Ty Gwent, a 35,287 sq ft office space at Llantarnam Business Park.

Arrow link.