Project Overview

FI Real Estate Management (FIREM), successfully refurbished Unit 4 at Severn Bridge Industrial Estate. The primary objective was to attract a tenant for the last remaining unit, requiring a comprehensive 12-week overhaul of both the exterior and interior spaces.

No items found.
Challenges and Objectives

The project aimed to enhance the property's appeal and provide high-quality facilities to meet the needs of potential occupiers. Key challenges included ensuring a swift turnaround and creating a space that aligns with the requirements of the incoming tenant, a haulage and logistics company set to occupy the unit.

No items found.
Results

The Lockwood Group signed a minimum five-year lease for the fully refurbished Unit 4, marking the full occupancy of Severn Bridge Industrial Estate. The successful collaboration showcased the capability to meet industry demands for premium industrial spaces.

No items found.

More Case Studies

OVO Energy

Design, Fit-out

OVO Energy

Comprehensive office refurbishment incorporating new flooring, plumbing, decoration, tiling, cubicle installation, and the supply of lockers and benches.​

Arrow link.
Finzels

Dilapidation Work, Cat A+

Finzels

A sensitive upgrade of a historic space, this project balanced essential landlord works with design-led enhancements to create a high-quality, ready-to-let workspace within a listed building.

Arrow link.