Refurbishment Program

3 Newbridge Square underwent a large refurbishment program, including updated M&E throughout. The HVAC system was fully replaced, and significant adjustments were made to power, data, tea points, and lift lobbies. Floor finishes were replaced, and layout adjustments were made.

No items found.
Phased Serviced Offices Space

The building was occupied on three floors while the serviced offices space was phased to allow the users access to facilities. Due to the nature of the tenanted FIG Flex serviced offices, program, move management, and phasing were critical. Tight timeframes of existing tenants and transparency with quick return of their individual office space were crucial.

No items found.
Consideration for Tenants

In addition to the contracted works, consideration had to be given to the two tenants whose usage of the building was critical to their businesses and were involved in the planning throughout. The ground floor reception and café area had to be maintained as a meeting space and access points.

No items found.

More Case Studies

Pepper Money

Design, Fit-out

Pepper Money

12,000 sqft office expansion & renovation for Pepper Money, Cardiff. Repurposed space, maximised desk numbers & updated branding

Arrow link.
VIO Office Space

Design, Fit-out

VIO Office Space

Refurbishment project for our esteemed client, VIO Office, located in their Bath Street office where several of the buildings have been designated as Grade I listed buildings. Vio office offers a range of self-contained serviced office suites, providing a personalised and bespoke experience for their clients!

Arrow link.