Project overview

Project XV worked in close partnership with Rhian Worgan Interior Design to transform the reception area and ground floor suite of a commercial property. The aim was to enhance both functionality and aesthetic appeal, creating a cohesive and welcoming environment for current and prospective tenants.

No items found.
Key initiatives

The reception was reimagined with a range of bespoke features to deliver a warm first impression. This included custom-built bench seating, foliage lighting, and carefully considered signage. A moss and timber slatted feature wall became a central design element, adding texture and a biophilic feel to the space.

No items found.
Implementation and Progress

To introduce personality and flow throughout the suite, a feature slatted wall was installed, complemented by greenery and soft furnishings. A modern, contemporary kitchen was added to elevate the space and provide both visual interest and practical use.

No items found.

More Case Studies

Beacon Tower - Kinisi Industries

Fit-out

Beacon Tower - Kinisi Industries

Project XV were instructed by AEW to fitout the 13th floor of beacon Tower for incoming tenant Kinisi Industries.

Arrow link.
Helastel - Beacon Tower 5th floor

CAT-A Fit-out

Helastel - Beacon Tower 5th floor

Transform former tenant space into a modern, flexible, and refurbished floor for incoming tenants.